ConstructionHighway | Details |
|---|
I-5 MP 14 I-5, Intersection with Green Springs Highway ORE66 Incident #:85670 | Estimated delay under 20 minutes Construction Work Off Ramp Comments: Expect lane closures on I-5 at the Exit 14 interchange at night, from 7 PM to 7 AM. Also intermittent day-time lane closures in the work zone. Ramps Affected. Public Contact: ODOT/STOC Central Point/Medford Last Updated: 09/03/2010 9:35 pm <return to map |
I-5 MP 19 I-5, 4 miles North of Ashland Incident #:90835 | Estimated delay under 20 minutes Construction Work Off Ramp Comments: Expect nighttime lane closures throughout the Exit 19 interchange. Daytime lane closures on Valley View Road. This is for a new bridge project. Ramps Affected. Public Contact: ODOT/STOC Central Point/Medford Last Updated: 09/03/2010 9:37 pm <return to map |
I-5 MP 103 - 112
I-5, 5 miles North of Canyonville Incident #:92086 | Estimated delay under 20 minutes Maintenance Work Lanes Affected: (Southbound) 2 Lanes (Northbound) 2 Lanes Comments: Expect nighttime lane closures, NB and SB for road work. Most of the work will be from MP 108-109, use caution and watch for signs. Public Contact: ODOT/STOC Central Point/Medford Last Updated: 09/05/2010 02:40 am <return to map |
I-5 MP 111 - 113
I-5, 13 miles North of Canyonville Incident #:88169 | Estimated delay under 20 minutes Construction Work On Ramp Lanes Affected: (Southbound) 1 Lane , Shoulder Comments: The SB I-5 on-ramp at exit 112 (Dillard) will be closed Sept. 7 to Sept. 30. Use on-ramp at exit 113 (Clarks Branch). Watch for signs, message boards. Ramps Affected. I-5 motorists watch for traffic control devices. Expect intermittent lane closures. This is for construction of a weigh station.
Public Contact: ODOT/STOC Central Point/Medford Last Updated: 09/03/2010 10:58 pm <return to map |
I-5 MP 1 I-5, 1 mile North of Oregon - California Border Incident #:88907 | Informational only Construction Work Lanes Affected: (Northbound) , Shoulder Comments: Watch for shoulder closures and construction equipment. This project is to upgrade the signs and lighting in the NB chain-up area. Public Contact: ODOT/STOC Central Point/Medford
Last Updated: 09/03/2010 10:26 pm <return to map |
I-5 MP 34 I-5, Central Point Incident #:89181 | Informational only Construction Work Lanes Affected: (Northbound) , Shoulder Comments: Road construction is occurring, use caution. Public Contact: ODOT/STOC Central Point/Medford
Last Updated: 09/03/2010 7:46 pm <return to map |
I-5 MP 35.7 - 36.6
I-5, Intersection with Pacific Highway East ORE99E Incident #:38034 | Informational only Construction Work Off Ramp Lanes Affected: (Southbound) Median , 2 Lanes (Northbound) Median Comments: Expect night time single lane closures, both NB and SB for final paving and striping. Ramps Affected. Public Contact: ODOT/STOC Central Point/Medford Phone: (800) 977-6368 Last Updated: 09/03/2010 9:31 pm <return to map |
ORE42 MP 5 - 41
ORE42, 5 miles East of Intersection with Oregon Coast Highway US101 Incident #:88139 | Estimated delay under 20 minutes Construction Work Lanes Affected: (Westbound) 2 Lanes (Eastbound) 2 Lanes Comments: Expect intermittent lane closures throughout the work zone, 24/7. Traffic controlled by flaggers and temporary traffic signals. Use caution. Public Contact: ODOT/STOC Central Point/Medford Last Updated: 09/03/2010 10:48 pm <return to map |
ORE42 MP 69.3 - 72.5
ORE42, 4 miles West of Winston Incident #:85645 | Estimated delay under 20 minutes Construction Work Lanes Affected: (Westbound) 2 Lanes (Eastbound) 2 Lanes Comments: Traffic will be reduced to a single lane with 24 hour flagging, from September 7, to the 20th. Public Contact: ODOT/STOC Central Point/Medford Last Updated: 09/03/2010 11:04 pm <return to map |
ORE62 MP 10 - 18.4
ORE62, 3 miles East of White City Incident #:92088 | Estimated delay under 20 minutes Construction Work Lanes Affected: (Westbound) 1 Lane Comments: Expect intermittent nighttime lane closures from Linn Road to Shady Cove City limits. This project is for pavement work.
Public Contact: ODOT/STOC Central Point/Medford Last Updated: 09/05/2010 12:07 am <return to map |
ORE62 MP 2 - 3
ORE62, Medford Incident #:88906 | Informational only Construction Work Lanes Affected: (Westbound) , Shoulder Comments: Road construction is occurring, use caution. Public Contact: ODOT/STOC Central Point/Medford
Last Updated: 09/04/2010 11:18 pm <return to map |
ORE99 MP .09 ORE234, Intersection with Rogue River Highway ORE99 Incident #:76126 | Estimated delay under 20 minutes Construction Work Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane Comments: The Rock Point Bridge will be closed for eight weeks, for paving. Detours are in place. This is for the rehabilitation of the Historic Rock Point Bridge, on Sams Valley Hwy.
Public Contact: ODOT/STOC Central Point/Medford Phone: (800) 977-6368 Last Updated: 09/03/2010 9:40 pm <return to map |
ORE230 MP 0 - 12
ORE230, Intersection with Crater Lake Highway ORE62 Incident #:86995 | Estimated delay under 20 minutes Construction Work Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane Comments: There is a traffic signal at the Rogue River Bridge, MP 5. At mp 0 to 1, and mp 10, traffic is reduced to one lane with 24 hour flagging. Public Contact: ODOT/STOC Central Point/Medford Last Updated: 09/03/2010 11:09 pm <return to map |
ORE234 MP 16 ORE234, 1 mile West of Intersection with Crater Lake Highway ORE62 Incident #:90493 | Estimated delay under 20 minutes Construction Work Comments: Expect traffic control with flaggers on Dodge Bridge, Monday through Thursday. Work hours are 7 AM to 5 PM. Watch for advance signs. This is for upgrades to the bridge.
Public Contact: ODOT/STOC Central Point/Medford Last Updated: 09/03/2010 9:43 pm <return to map |
US97 MP 257.8 - 265.6
US97, 16 miles North of Klamath Falls Incident #:82013 | Estimated delay under 20 minutes Construction Work Lanes Affected: (Northbound) 1 Lane , Shoulder (Southbound) 2 Lanes , Shoulder Comments: At night expect traffic control with flaggers and pilot cars, 7 PM to 7 AM. Daytime work hours are 7 AM to 7 PM, with no expected delays. Click here for additional information Public Contact: Southern TOC Phone: (541) 858-3103 Last Updated: 09/03/2010 8:58 pm <return to map |
US101 MP 303.9 - 310.3
US101, 4 miles South of Port Orford Incident #:86692 | Estimated delay under 20 minutes Construction Work Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane Comments: At MP 306, traffic is reduced to a single lane, controlled by a temporary traffic signal. Watch for signs and use caution. Public Contact: ODOT/STOC Central Point/Medford Last Updated: 09/03/2010 10:49 pm <return to map |
US101 MP 330 - 348
US101, Gold Beach Incident #:85632 | Estimated delay under 20 minutes Construction Work Lanes Affected: (Northbound) 1 Lane , Shoulder (Southbound) 1 Lane , Shoulder Comments: Expect intermittent lane closures and flaggers throughout the work zone. Public Contact: ODOT/STOC Central Point/Medford Last Updated: 09/03/2010 10:50 pm <return to map |
US199 MP 10 - 11.35
US199, 2 miles North of Wonder Incident #:86975 | Informational only Construction Work Lanes Affected: (Northbound) , Shoulder Comments: The NB shoulder is closed for the installation of signs and landscaping work. Public Contact: ODOT/STOC Central Point/Medford
Last Updated: 09/03/2010 10:30 pm <return to map |
Trucking (Commercial Vehicle) RestrictionsHighway | Details |
|---|
I-5 MP 104.85 I-5, 7 miles North of Canyonville Incident #: 73548 | Informational only Commercial Vehicle Information Details: I-5 MP 104.85 Chadwick Ln crossing over I-5 MP 104.85 Chadwick Lane crossing over I-5 (near Riddle) 20,000 single axle, 34,000 lbs. tandem axle - 80,000 lbs. GVW. Weight Table 1 Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 09/06/2010 7:00 pm <return to map |
I-5 MP 108.47 - 107.5
I-5, 10 miles North of Canyonville Incident #: 92061 | Informational only Commercial Vehicle Information Details: I-5 MP 109 to MP 107.5 SB Effective September 13, 2010, this section of I-5 will be restricted to 13 feet 00 in. in width between the hours of 8:30 PM & 6 AM. In addition, this section of I-5 will be restricted to 16 feet 00 in. in width between the hours of 6 AM and 12 PM. Estimated date of completion is September 17, 2010. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 09/06/2010 7:00 pm <return to map |
I-5 MP 112.23 I-5, 13 miles South of Roseburg Incident #: 90175 | Informational only Commercial Vehicle Information Details: I-5 MP 111 to MP 112 SB Effective September 7, 2010, this section of I-5 southbound will be restricted to 16 feet 00 in. in width. In addition, the SB I-5 on-ramp at Exit 112 will be closed. Estimated date of completion is September 30, 2010. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 09/06/2010 7:00 pm <return to map |
ORE42 MP 25.52 - 25.67
ORE42, 5 miles East of Myrtle Point Incident #: 87244 | Informational only Commercial Vehicle Information Details: OR42 MP 25.50 to MP 25.75 EB & WB (Indian Creek Bridge -E of Myrtle Point) Effective September 13, 2010, this section of OR42 will be restricted to 10 feet 00 in. in width. Estimated date of completion is October 25, 2010. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 09/06/2010 7:00 pm <return to map |
ORE42 MP 43.59 - 46.24
ORE42, 7 miles East of Remote Incident #: 88532 | Informational only Commercial Vehicle Information Details: OR42 MP 43.60 to MP 46.00 EB & WB Effective July 12, 2010 this section of OR42 is restricted to 16 feet 00 in. in width between the hours of 7 AM and 7 PM on weekdays. No work will occur between the hours of 3 PM on Fridays until Noon on Mondays. Estimated date of completion is September 17, 2010. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 09/06/2010 7:00 pm <return to map |
ORE230 MP .58 ORE230, 1 mile East of Intersection with Crater Lake Highway ORE62 Incident #: 89288 | Informational only Commercial Vehicle Information Details: OR230 MP 0.58 EB & WB - Castle Creek Bridge Effective August 9, 2010, this section of OR230 will be restricted to 10 feet 00 in. in width. Estimated date of completion is October 29, 2010. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 09/06/2010 7:00 pm <return to map |
ORE230 MP .96 ORE230, 1 mile East of Intersection with Crater Lake Highway ORE62 Incident #: 89289 | Informational only Commercial Vehicle Information Details: OR230 MP 0.96 EB & WB - Bybee Creek Bridge Effective August 9, 2010, this section of OR230 will be restricted to 10 feet 00 in. in width. Estimated date of completion is October 29, 2010. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 09/06/2010 7:00 pm <return to map |
ORE230 MP 5.16 - 5.99
ORE230, 5 miles East of Intersection with Crater Lake Highway ORE62 Incident #: 86342 | Informational only Commercial Vehicle Information Details: OR230 MP 4.96 to MP 5.61 NB & SB Effective June 16, 2010, this section of OR230 will be restricted to 10 feet 00 in. in width. Estimated date of completion is October 28, 2010. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 09/06/2010 7:00 pm <return to map |
ORE230 MP 10.32 ORE230, 10 miles East of Intersection with Crater Lake Highway ORE62 Incident #: 89325 | Informational only Commercial Vehicle Information Details: OR230 MP 10.32 EB & WB - Muir Creek Bridge Effective August 9, 2010, this section of OR230 will be restricted to 10 feet 00 in. in width. Estimated date of completion is October 29, 2010. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 09/06/2010 7:00 pm <return to map |
ORE234 MP .04 ORE234, Intersection with Rogue River Highway ORE99 Incident #: 83425 | Informational only Commercial Vehicle Information Details: OR234 MP 0.04 EB & WB (Rogue River Bridge near I-5 Exit 43) - Gold Hill OR234 where it crosses the Rogue River Bridge has been partially re-opened. The northbound (eastbound) lane is NOW OPEN for one-way traffic only. The southbound (westbound) lane across the bridge is STILL CLOSED. THE BRIDGE IS ALSO RESTRICTED TO 20,000 LBS. TOTAL WEIGHT. In addition, the width is restricted to 11 feet 00 in. in width. The bridge will be shut down again TO ALL TRAFFIC after Labor Day and estimated to re-open on October 22, 2010. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 09/06/2010 7:00 pm <return to map |
ORE234 MP 16.01 ORE234, 1 mile West of Intersection with Crater Lake Highway ORE62 Incident #: 89889 | Informational only Commercial Vehicle Information Details: OR234 MP 15.91 to MP 16.11 EB & WB (Rogue River Bridge) Effective August 9, 2010, this section of OR234 will be restricted to 12 feet 00 in. in width and 14 feet 10 in. in height between the hours of 6 AM & 6 PM. Estimated date of completion is October 31, 2010. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 09/06/2010 7:00 pm <return to map |
US101 MP 303.72 - 306.35
US101, 4 miles South of Port Orford Incident #: 86165 | Informational only Commercial Vehicle Information Details: US101 MP 303.81 to MP 306.60 NB & SB (South of Port Orford) Effective June 1, 2010, this section of US101 will be restricted to 14 feet 00 in. in width. Estimated date of completion is September 30, 2010. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 09/06/2010 7:00 pm <return to map |
US101 MP 306.35 - 303.72
US101, 6 miles South of Port Orford Incident #: 81989 | Informational only Commercial Vehicle Information Details: US101 MP 303.81 to MP 306.60 NB & SB (South of Port Orford) Effective June 1, 2010, this section of US101 will be restricted to 14 feet 00 in. in width. Estimated date of completion is September 30, 2010. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 09/06/2010 7:00 pm <return to map |
US199 MP 6.97 US199, 5 miles North of Wonder Incident #: 73563 | Informational only Commercial Vehicle Information Details: US199 MP 7.0 Applegate River Bridge MP 7.0 Applegate River Bridge (7 miles west of Grants Pass) is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW. Weight Table 2 for Divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW. Weight Table 3 for Non-Divisible loads. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 09/06/2010 7:00 pm <return to map |
Automated Road & Weather StationsLocation | Details |
|---|
| I-5 at Sexton Summit | Temp: 51.4F Dew Point: 45F Rel. Humidity: 79% Wind Direction: NE Wind (Avg.): 4 mph Wind (Gusts): 6 mph Precipitation: 0.0 in.
Last Updated: 09/07/10 05:53 am
<return to map |
| I-5 at Siskiyou Summit | Temp: 46F Dew Point: 34.9F Rel. Humidity: 64% Wind Direction: NE Wind (Avg.): 2 mph Wind (Gusts): 4 mph Visibility: 1.1 mi.
Last Updated: 09/07/10 05:45 am
<return to map |
| OR42 at Camas Mountain | Temp: 47.5F Dew Point: 46F Rel. Humidity: 94% Wind Direction: W Wind (Avg.): 1 mph Wind (Gusts): 3 mph
Last Updated: 09/07/10 05:48 am
<return to map |
| ORE140 at Butte Creek | Temp: 37.6F Dew Point: 34.9F Rel. Humidity: 89% Wind Direction: N Wind (Avg.): 0 mph Wind (Gusts): 1 mph
Last Updated: 09/07/10 05:53 am
<return to map |
| ORE140 at Doak Mountain | Temp: 39.4F Dew Point: 33.6F Rel. Humidity: 80% Wind Direction: E Wind (Avg.): 3 mph Wind (Gusts): 3 mph
Last Updated: 09/07/10 05:52 am
<return to map |
| ORE230 at Diamond Lake | Temp: 33.5F Dew Point: 25F Rel. Humidity: 71% Wind Direction: E Wind (Avg.): 1 mph Wind (Gusts): 1 mph
Last Updated: 09/07/10 05:45 am
<return to map |
| ORE42 at Coos County Line | Temp: 52.5F Dew Point: 46.1F Rel. Humidity: 79% Wind Direction: E Wind (Avg.): 0 mph Wind (Gusts): 1 mph
Last Updated: 09/07/10 05:48 am
<return to map |
| US101 at Gold Beach | Temp: 54.7F Wind Direction: NE Wind (Avg.): 8 mph Wind (Gusts): 10 mph
Last Updated: 09/07/10 05:49 am
<return to map |
| US101 at Humbug Mt | Wind Direction: S Wind (Avg.): 1 mph Wind (Gusts): 3 mph
Last Updated: 09/07/10 05:54 am
<return to map |
| US101 at Port Orford | Temp: 57.4F Dew Point: 55.4F Rel. Humidity: 93% Wind Direction: N Wind (Avg.): 3 mph Wind (Gusts): 3 mph
Last Updated: 09/07/10 05:47 am
<return to map |
| US199 at Hayes Hill | Temp: 45.9F Dew Point: 41.9F Rel. Humidity: 86% Wind Direction: N Wind (Avg.): 0 mph Wind (Gusts): 0 mph Precipitation: 0.0 in.
Last Updated: 09/07/10 05:40 am
<return to map |
| US199 at OBrien | Temp: 45.4F Dew Point: 42.7F Rel. Humidity: 90% Precipitation: 0.0 in.
Last Updated: 09/07/10 05:46 am
<return to map |
| US97 at Modoc Point | Temp: 50F Dew Point: 41.7F Rel. Humidity: 73% Wind Direction: NE Wind (Avg.): 2 mph Wind (Gusts): 5 mph
Last Updated: 09/07/10 05:50 am
<return to map |